Comportamento dos custos da construção civil na Universidade Federal de Santa Maria
Autor(a) principal: | |
---|---|
Data de Publicação: | 2016 |
Tipo de documento: | Dissertação |
Idioma: | por |
Título da fonte: | Repositório Institucional Manancial UFSM |
Texto Completo: | http://repositorio.ufsm.br/handle/1/8389 |
Resumo: | Federal Universities promote higher education, and for that receive funds to be administered by public managers. Especially in 2007 with the establishment of the Restructuring Program and Expansion of Federal Universities resources for investment grew, allowing universities to intensify the expansion of its physical space. To contract engineering services the public administrator must follow the rules established primarily by Federal Law 8.666/93. Following the legislation, from construction planning to conclusion, the hiring process goes through several stages. As regards the building costs, this appears mainly in three stages: in the standard budget to public competition, the ratification of the contracted company and the final stage of the building conclusion. This thesis aimed to study the behavior of the civil construction costs at the Federal University of Santa Maria from 2010 to 2014, in especially regarding the estimated costs, the granted costs and the final cost of the work. This study is justified due to the relevance of the subject, because it is the use of public resources, largely originated from taxes collected from society. The study was developed through qualitative and quantitative research, using as a way the document and literature research and a ending the descriptive research. The results show the variations between planned and executed time, with a percentage of 75.55% of the construction resulting in terms of time additives, among the main causes identifies the change or project adjustments. Regarding per m² cost variation, the contracts are separated into groups according to the characteristics of the works, showing that the group with precast construction sets has the highest percentage of bids accepted and executed that were made at lower costs than budgeted. The group of buildings is the one with the highest percentage of additives terms and due to this the greater variation between the budgeted and executed. In canceled contracts, all unilaterally by the federal government, the cause listed was the contract break on estabilished schedule. |
id |
UFSM-20_6bf772617bbf45948b9d526d94fac466 |
---|---|
oai_identifier_str |
oai:repositorio.ufsm.br:1/8389 |
network_acronym_str |
UFSM-20 |
network_name_str |
Repositório Institucional Manancial UFSM |
repository_id_str |
3913 |
spelling |
2016-07-272016-07-272016-03-21COLPO, Iliane. Behavior of civil construction costs at Federal University of Santa Maria. 2016. 94 f. Dissertação (Mestrado em Engenharia de Produção) - Universidade Federal de Santa Maria, Santa Maria, 2016.http://repositorio.ufsm.br/handle/1/8389Federal Universities promote higher education, and for that receive funds to be administered by public managers. Especially in 2007 with the establishment of the Restructuring Program and Expansion of Federal Universities resources for investment grew, allowing universities to intensify the expansion of its physical space. To contract engineering services the public administrator must follow the rules established primarily by Federal Law 8.666/93. Following the legislation, from construction planning to conclusion, the hiring process goes through several stages. As regards the building costs, this appears mainly in three stages: in the standard budget to public competition, the ratification of the contracted company and the final stage of the building conclusion. This thesis aimed to study the behavior of the civil construction costs at the Federal University of Santa Maria from 2010 to 2014, in especially regarding the estimated costs, the granted costs and the final cost of the work. This study is justified due to the relevance of the subject, because it is the use of public resources, largely originated from taxes collected from society. The study was developed through qualitative and quantitative research, using as a way the document and literature research and a ending the descriptive research. The results show the variations between planned and executed time, with a percentage of 75.55% of the construction resulting in terms of time additives, among the main causes identifies the change or project adjustments. Regarding per m² cost variation, the contracts are separated into groups according to the characteristics of the works, showing that the group with precast construction sets has the highest percentage of bids accepted and executed that were made at lower costs than budgeted. The group of buildings is the one with the highest percentage of additives terms and due to this the greater variation between the budgeted and executed. In canceled contracts, all unilaterally by the federal government, the cause listed was the contract break on estabilished schedule.As universidades federais promovem a educação de nível superior, e para isso recebem recursos que devem ser administrados pelos gestores públicos. Especialmente no ano de 2007 com a instituição do Programa de Restruturação e Expansão das Universidades Federais os recursos destinados a investimentos cresceram, possibilitando às universidades intensificar a ampliação do seu espaço físico. Para a contratação de serviços de engenharia o administrador público tem o dever de seguir as normas estabelecidas principalmente pela Lei 8.666/93. Seguindo a legislação vigente, do planejamento até conclusão das obras, o processo de contratação perpassa por várias etapas. No que se refere ao custo das obras, este se apresenta principalmente em três momentos: no orçamento referência para a concorrência pública, na adjudicação da empresa contratada e a fase final de conclusão da obra. Essa dissertação teve como objetivo estudar o comportamento dos custos das obras de construção civil na Universidade Federal de Santa Maria do período de 2010 a 2014, em especial no que se refere aos custos orçados, o custo adjudicado e o custo final da obra. Justifica-se este trabalho devido à relevância do tema, pois se trata da aplicação dos recursos públicos, em grande parte, advindos dos tributos recolhidos da sociedade. O estudo desenvolveu-se através de pesquisa qualitativa e quantitativa, que utiliza como meio a pesquisa documental e bibliográfica e como fins a pesquisa descritiva. Os resultados mostram as variações entre o tempo planejado e executado, com um percentual de 75,55% de obras com termos aditivos de tempo, entre as principais causas se identifica a alteração ou ajustes de projetos. Em relação às variações de custo por m2, os contratos são separados por grupos conforme características das obras, mostrando que o grupo de pré-moldados tem o maior percentual de propostas aceitas e executadas que foram realizadas com custos menores que o orçado. O grupo dos prédios é o que apresenta o maior percentual de aditivos de quantidades e em função disto o maior valor de variação entre o orçado e o executado. Nos contratos rescindidos, todos de forma unilateral por parte da administração federal, a causa elencada foi o não cumprimento do contrato dentro do cronograma estabelecido.application/pdfporUniversidade Federal de Santa MariaPrograma de Pós-Graduação em Engenharia de ProduçãoUFSMBREngenharia de ProduçãoGestãoUniversidades públicasCustosObrasManagementPublic universitiesCostsConstructionCNPQ::ENGENHARIAS::ENGENHARIA DE PRODUCAOComportamento dos custos da construção civil na Universidade Federal de Santa MariaBehavior of civil construction costs at Federal University of Santa Mariainfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisWeise, Andreas Dittmarhttp://lattes.cnpq.br/1329623071793399Rabenschlag, Denis Rasquinhttp://lattes.cnpq.br/5008073653404072Brinckmann, Roquehttp://lattes.cnpq.br/1941182146354799http://lattes.cnpq.br/3609862957945768Colpo, Iliane300800000005400300300500300a00c0b69-dbf1-4f0b-811a-d6239bbcc23799719d9e-20f7-45c7-a59c-9da5645a8eda8080f509-3c5c-49b0-bfd1-e270c36b386eb04f109f-2fbb-4952-beee-06491b54a20binfo:eu-repo/semantics/openAccessreponame:Repositório Institucional Manancial UFSMinstname:Universidade Federal de Santa Maria (UFSM)instacron:UFSMORIGINALCOLPO, ILIANE.pdfapplication/pdf2050242http://repositorio.ufsm.br/bitstream/1/8389/1/COLPO%2c%20ILIANE.pdf800f1f38ba602080bcb1a50cdcf1e32cMD51TEXTCOLPO, ILIANE.pdf.txtCOLPO, ILIANE.pdf.txtExtracted texttext/plain172958http://repositorio.ufsm.br/bitstream/1/8389/2/COLPO%2c%20ILIANE.pdf.txt496893404f9bf58c79e0356d30d85884MD52THUMBNAILCOLPO, ILIANE.pdf.jpgCOLPO, ILIANE.pdf.jpgIM Thumbnailimage/jpeg4142http://repositorio.ufsm.br/bitstream/1/8389/3/COLPO%2c%20ILIANE.pdf.jpg8d0f769057d93705ae2efc573017ee58MD531/83892022-03-17 11:25:48.93oai:repositorio.ufsm.br:1/8389Repositório Institucionalhttp://repositorio.ufsm.br/PUBhttp://repositorio.ufsm.br/oai/requestouvidoria@ufsm.bropendoar:39132022-03-17T14:25:48Repositório Institucional Manancial UFSM - Universidade Federal de Santa Maria (UFSM)false |
dc.title.por.fl_str_mv |
Comportamento dos custos da construção civil na Universidade Federal de Santa Maria |
dc.title.alternative.eng.fl_str_mv |
Behavior of civil construction costs at Federal University of Santa Maria |
title |
Comportamento dos custos da construção civil na Universidade Federal de Santa Maria |
spellingShingle |
Comportamento dos custos da construção civil na Universidade Federal de Santa Maria Colpo, Iliane Gestão Universidades públicas Custos Obras Management Public universities Costs Construction CNPQ::ENGENHARIAS::ENGENHARIA DE PRODUCAO |
title_short |
Comportamento dos custos da construção civil na Universidade Federal de Santa Maria |
title_full |
Comportamento dos custos da construção civil na Universidade Federal de Santa Maria |
title_fullStr |
Comportamento dos custos da construção civil na Universidade Federal de Santa Maria |
title_full_unstemmed |
Comportamento dos custos da construção civil na Universidade Federal de Santa Maria |
title_sort |
Comportamento dos custos da construção civil na Universidade Federal de Santa Maria |
author |
Colpo, Iliane |
author_facet |
Colpo, Iliane |
author_role |
author |
dc.contributor.advisor1.fl_str_mv |
Weise, Andreas Dittmar |
dc.contributor.advisor1Lattes.fl_str_mv |
http://lattes.cnpq.br/1329623071793399 |
dc.contributor.referee1.fl_str_mv |
Rabenschlag, Denis Rasquin |
dc.contributor.referee1Lattes.fl_str_mv |
http://lattes.cnpq.br/5008073653404072 |
dc.contributor.referee2.fl_str_mv |
Brinckmann, Roque |
dc.contributor.referee2Lattes.fl_str_mv |
http://lattes.cnpq.br/1941182146354799 |
dc.contributor.authorLattes.fl_str_mv |
http://lattes.cnpq.br/3609862957945768 |
dc.contributor.author.fl_str_mv |
Colpo, Iliane |
contributor_str_mv |
Weise, Andreas Dittmar Rabenschlag, Denis Rasquin Brinckmann, Roque |
dc.subject.por.fl_str_mv |
Gestão Universidades públicas Custos Obras |
topic |
Gestão Universidades públicas Custos Obras Management Public universities Costs Construction CNPQ::ENGENHARIAS::ENGENHARIA DE PRODUCAO |
dc.subject.eng.fl_str_mv |
Management Public universities Costs Construction |
dc.subject.cnpq.fl_str_mv |
CNPQ::ENGENHARIAS::ENGENHARIA DE PRODUCAO |
description |
Federal Universities promote higher education, and for that receive funds to be administered by public managers. Especially in 2007 with the establishment of the Restructuring Program and Expansion of Federal Universities resources for investment grew, allowing universities to intensify the expansion of its physical space. To contract engineering services the public administrator must follow the rules established primarily by Federal Law 8.666/93. Following the legislation, from construction planning to conclusion, the hiring process goes through several stages. As regards the building costs, this appears mainly in three stages: in the standard budget to public competition, the ratification of the contracted company and the final stage of the building conclusion. This thesis aimed to study the behavior of the civil construction costs at the Federal University of Santa Maria from 2010 to 2014, in especially regarding the estimated costs, the granted costs and the final cost of the work. This study is justified due to the relevance of the subject, because it is the use of public resources, largely originated from taxes collected from society. The study was developed through qualitative and quantitative research, using as a way the document and literature research and a ending the descriptive research. The results show the variations between planned and executed time, with a percentage of 75.55% of the construction resulting in terms of time additives, among the main causes identifies the change or project adjustments. Regarding per m² cost variation, the contracts are separated into groups according to the characteristics of the works, showing that the group with precast construction sets has the highest percentage of bids accepted and executed that were made at lower costs than budgeted. The group of buildings is the one with the highest percentage of additives terms and due to this the greater variation between the budgeted and executed. In canceled contracts, all unilaterally by the federal government, the cause listed was the contract break on estabilished schedule. |
publishDate |
2016 |
dc.date.accessioned.fl_str_mv |
2016-07-27 |
dc.date.available.fl_str_mv |
2016-07-27 |
dc.date.issued.fl_str_mv |
2016-03-21 |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/masterThesis |
format |
masterThesis |
status_str |
publishedVersion |
dc.identifier.citation.fl_str_mv |
COLPO, Iliane. Behavior of civil construction costs at Federal University of Santa Maria. 2016. 94 f. Dissertação (Mestrado em Engenharia de Produção) - Universidade Federal de Santa Maria, Santa Maria, 2016. |
dc.identifier.uri.fl_str_mv |
http://repositorio.ufsm.br/handle/1/8389 |
identifier_str_mv |
COLPO, Iliane. Behavior of civil construction costs at Federal University of Santa Maria. 2016. 94 f. Dissertação (Mestrado em Engenharia de Produção) - Universidade Federal de Santa Maria, Santa Maria, 2016. |
url |
http://repositorio.ufsm.br/handle/1/8389 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.cnpq.fl_str_mv |
300800000005 |
dc.relation.confidence.fl_str_mv |
400 300 300 500 300 |
dc.relation.authority.fl_str_mv |
a00c0b69-dbf1-4f0b-811a-d6239bbcc237 99719d9e-20f7-45c7-a59c-9da5645a8eda 8080f509-3c5c-49b0-bfd1-e270c36b386e b04f109f-2fbb-4952-beee-06491b54a20b |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Federal de Santa Maria |
dc.publisher.program.fl_str_mv |
Programa de Pós-Graduação em Engenharia de Produção |
dc.publisher.initials.fl_str_mv |
UFSM |
dc.publisher.country.fl_str_mv |
BR |
dc.publisher.department.fl_str_mv |
Engenharia de Produção |
publisher.none.fl_str_mv |
Universidade Federal de Santa Maria |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional Manancial UFSM instname:Universidade Federal de Santa Maria (UFSM) instacron:UFSM |
instname_str |
Universidade Federal de Santa Maria (UFSM) |
instacron_str |
UFSM |
institution |
UFSM |
reponame_str |
Repositório Institucional Manancial UFSM |
collection |
Repositório Institucional Manancial UFSM |
bitstream.url.fl_str_mv |
http://repositorio.ufsm.br/bitstream/1/8389/1/COLPO%2c%20ILIANE.pdf http://repositorio.ufsm.br/bitstream/1/8389/2/COLPO%2c%20ILIANE.pdf.txt http://repositorio.ufsm.br/bitstream/1/8389/3/COLPO%2c%20ILIANE.pdf.jpg |
bitstream.checksum.fl_str_mv |
800f1f38ba602080bcb1a50cdcf1e32c 496893404f9bf58c79e0356d30d85884 8d0f769057d93705ae2efc573017ee58 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 |
repository.name.fl_str_mv |
Repositório Institucional Manancial UFSM - Universidade Federal de Santa Maria (UFSM) |
repository.mail.fl_str_mv |
ouvidoria@ufsm.br |
_version_ |
1808854689437974528 |