The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors
Autor(a) principal: | |
---|---|
Data de Publicação: | 2015 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Gestão e Projetos (GeP) |
Texto Completo: | https://periodicos.uninove.br/gep/article/view/9615 |
Resumo: | This study aims to analyze the management of the projects schedule in civil engineering companies from Caruaru, from the PMBOK assumptions, focusing on the development and monitoring schedule. To support the study, was made a review on projects, project management, management and development methodology and monitoring schedule. To perform the study was developed a descriptive and explanatory research with quantitative approach. The sample consisted of 44 respondents and the survey questionnaire was developed with primary basis in the PMBOK (2008) and other authors in the field. The completion of data collection was through the use of structured surveys questionnaires, with adapted percentage of Likert scale. The analysis and the diagnosis of the figures were made from the development of the multiple linear regression method, using the statistical program STATISTICA 8. The generated model explains 72% of the development process and monitoring the schedule of projects in the surveyed companies and can be explained by the three independent variables generated: Description of Project Delivery; Activity durations developed from specific techniques; and monitoring the progress of the scope and schedule with analysis of variance. |
id |
UNINOVE-4_28057edc6e733217fee8b350873b922f |
---|---|
oai_identifier_str |
oai:https://periodicos.uninove.br:article/9615 |
network_acronym_str |
UNINOVE-4 |
network_name_str |
Revista Gestão e Projetos (GeP) |
repository_id_str |
|
spelling |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant FactorsA Gestão de Cronograma em Empresas de Engenharia Civil: Um Estudo sobre os Fatores DeterminantesSchedule; Projects; Civil Engineering.Cronograma; Projetos; Engenharia Civil.This study aims to analyze the management of the projects schedule in civil engineering companies from Caruaru, from the PMBOK assumptions, focusing on the development and monitoring schedule. To support the study, was made a review on projects, project management, management and development methodology and monitoring schedule. To perform the study was developed a descriptive and explanatory research with quantitative approach. The sample consisted of 44 respondents and the survey questionnaire was developed with primary basis in the PMBOK (2008) and other authors in the field. The completion of data collection was through the use of structured surveys questionnaires, with adapted percentage of Likert scale. The analysis and the diagnosis of the figures were made from the development of the multiple linear regression method, using the statistical program STATISTICA 8. The generated model explains 72% of the development process and monitoring the schedule of projects in the surveyed companies and can be explained by the three independent variables generated: Description of Project Delivery; Activity durations developed from specific techniques; and monitoring the progress of the scope and schedule with analysis of variance.O presente estudo tem como objetivo analisar a gestão do cronograma dos projetos nas empresas de engenharia civil de Caruaru, a partir dos pressupostos do PMBOK, com enfoque no desenvolvimento e monitoramento do cronograma. Para fundamentar o estudo, foi feito uma revisão bibliográfica sobre projetos, gestão de projetos, metodologia de gestão e desenvolvimento e monitoramento do cronograma. Para a realização do trabalho foi feita uma pesquisa descritiva e explicativa, com abordagem de natureza quantitativa. A amostra foi composta por 44 respondentes e o questionário de pesquisa foi elaborado com embasamento primordial no PMBOK (2008) e em demais autores da área. A realização da coleta dos dados foi mediante a aplicação de questionários surveys estruturados, com escala de porcentagem adaptada de Likert. A análise e o diagnóstico dos dados quantitativos foram realizados a partir do desenvolvimento do método de regressão linear múltipla, por meio do programa estatístico STATISTICA 8. O modelo gerado explica 72% do processo de desenvolvimento e monitoramento do cronograma dos projetos nas empresas pesquisadas e pode ser explicado pelas três variáveis independentes geradas: Descrição das Entregas do Projeto; Durações das atividades desenvolvidas a partir de técnicas específicas; e Monitoramento do andamento do escopo e do cronograma com análise de variação.Universidade Nove de Julho (Uninove)Silva Júnior, Antonio de SouzaSantos, Camila Tayná2015-04-28info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.uninove.br/gep/article/view/961510.5585/gep.v6i1.296Revista de Gestão e Projetos; v. 6, n. 1 (2015): janeiro-abril; 111-1242236-0972reponame:Revista Gestão e Projetos (GeP)instname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEporhttps://periodicos.uninove.br/gep/article/view/9615/4360Direitos autorais 2015 Antonio de Souza Silva Júnior, Camila Tayná Santosinfo:eu-repo/semantics/openAccess2019-05-27T21:11:10Zoai:https://periodicos.uninove.br:article/9615Revistahttps://periodicos.uninove.br/gepPRIhttps://periodicos.uninove.br/gep/oaigep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br2236-09722236-0972opendoar:2019-05-27T21:11:10Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)false |
dc.title.none.fl_str_mv |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors A Gestão de Cronograma em Empresas de Engenharia Civil: Um Estudo sobre os Fatores Determinantes |
title |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors |
spellingShingle |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors Silva Júnior, Antonio de Souza Schedule; Projects; Civil Engineering. Cronograma; Projetos; Engenharia Civil. |
title_short |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors |
title_full |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors |
title_fullStr |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors |
title_full_unstemmed |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors |
title_sort |
The Schedule Management in Civil Engineering Firms: A Study of the Determinant Factors |
author |
Silva Júnior, Antonio de Souza |
author_facet |
Silva Júnior, Antonio de Souza Santos, Camila Tayná |
author_role |
author |
author2 |
Santos, Camila Tayná |
author2_role |
author |
dc.contributor.none.fl_str_mv |
|
dc.contributor.author.fl_str_mv |
Silva Júnior, Antonio de Souza Santos, Camila Tayná |
dc.subject.por.fl_str_mv |
Schedule; Projects; Civil Engineering. Cronograma; Projetos; Engenharia Civil. |
topic |
Schedule; Projects; Civil Engineering. Cronograma; Projetos; Engenharia Civil. |
description |
This study aims to analyze the management of the projects schedule in civil engineering companies from Caruaru, from the PMBOK assumptions, focusing on the development and monitoring schedule. To support the study, was made a review on projects, project management, management and development methodology and monitoring schedule. To perform the study was developed a descriptive and explanatory research with quantitative approach. The sample consisted of 44 respondents and the survey questionnaire was developed with primary basis in the PMBOK (2008) and other authors in the field. The completion of data collection was through the use of structured surveys questionnaires, with adapted percentage of Likert scale. The analysis and the diagnosis of the figures were made from the development of the multiple linear regression method, using the statistical program STATISTICA 8. The generated model explains 72% of the development process and monitoring the schedule of projects in the surveyed companies and can be explained by the three independent variables generated: Description of Project Delivery; Activity durations developed from specific techniques; and monitoring the progress of the scope and schedule with analysis of variance. |
publishDate |
2015 |
dc.date.none.fl_str_mv |
2015-04-28 |
dc.type.none.fl_str_mv |
|
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9615 10.5585/gep.v6i1.296 |
url |
https://periodicos.uninove.br/gep/article/view/9615 |
identifier_str_mv |
10.5585/gep.v6i1.296 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9615/4360 |
dc.rights.driver.fl_str_mv |
Direitos autorais 2015 Antonio de Souza Silva Júnior, Camila Tayná Santos info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Direitos autorais 2015 Antonio de Souza Silva Júnior, Camila Tayná Santos |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
dc.source.none.fl_str_mv |
Revista de Gestão e Projetos; v. 6, n. 1 (2015): janeiro-abril; 111-124 2236-0972 reponame:Revista Gestão e Projetos (GeP) instname:Universidade Nove de Julho (UNINOVE) instacron:UNINOVE |
instname_str |
Universidade Nove de Julho (UNINOVE) |
instacron_str |
UNINOVE |
institution |
UNINOVE |
reponame_str |
Revista Gestão e Projetos (GeP) |
collection |
Revista Gestão e Projetos (GeP) |
repository.name.fl_str_mv |
Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE) |
repository.mail.fl_str_mv |
gep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br |
_version_ |
1797052865804500992 |