Project Performance Measurement Dashboard: A Proposal for Research and Development Organization
Autor(a) principal: | |
---|---|
Data de Publicação: | 2016 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Gestão e Projetos (GeP) |
Texto Completo: | https://periodicos.uninove.br/gep/article/view/9653 |
Resumo: | The research was motivated by the insufficient systematization of operational performance indicators of project monitoring, perceived by the managers of this when confronted with such concept of Terribili (2010), in a research and development (RD) organization, aiming to present a proposal for a project monitoring dashboard. The project management processes adopted by the organization were studied together with the theoretical survey to identify a set of indicators. The primary data collection was divided in interviews and questionnaires with managers. The interviews presented indicators resulting in a table of indicators. The questionnaires sought to validate the importance given by the managers to the indicators, to identify the level of coverage and form of presentation, resulting in the hierarchy of the indicators. Finally, the information was analyzed against the theory for the creation of project monitoring dashboards. Among the indicators of the theory, already used by the organization and suggested by the interviewees, eight were chosen to compose the dashboard shaped of two screen models: main, with a summary of the situation of all projects, and secondary, with the detailing of the indicators by project. As contributions the highlight is an identification of need for more in-depth study on rework indicators and lessons learned for RD organization. |
id |
UNINOVE-4_28cf7227a0935fdab505b59017313a2f |
---|---|
oai_identifier_str |
oai:https://periodicos.uninove.br:article/9653 |
network_acronym_str |
UNINOVE-4 |
network_name_str |
Revista Gestão e Projetos (GeP) |
repository_id_str |
|
spelling |
Project Performance Measurement Dashboard: A Proposal for Research and Development OrganizationPainel de Medição de Desempenho de Projetos: Uma Proposta para uma Organização de Pesquisa e DesenvolvimentoPerformance Indicators; Project Management; Dashboard; Research and Development.Indicadores de Desempenho; Gerenciamento de Projetos; Painel de Controle; Pesquisa e Desenvolvimento.The research was motivated by the insufficient systematization of operational performance indicators of project monitoring, perceived by the managers of this when confronted with such concept of Terribili (2010), in a research and development (RD) organization, aiming to present a proposal for a project monitoring dashboard. The project management processes adopted by the organization were studied together with the theoretical survey to identify a set of indicators. The primary data collection was divided in interviews and questionnaires with managers. The interviews presented indicators resulting in a table of indicators. The questionnaires sought to validate the importance given by the managers to the indicators, to identify the level of coverage and form of presentation, resulting in the hierarchy of the indicators. Finally, the information was analyzed against the theory for the creation of project monitoring dashboards. Among the indicators of the theory, already used by the organization and suggested by the interviewees, eight were chosen to compose the dashboard shaped of two screen models: main, with a summary of the situation of all projects, and secondary, with the detailing of the indicators by project. As contributions the highlight is an identification of need for more in-depth study on rework indicators and lessons learned for RD organization.A pesquisa motivou-se pela insuficiente sistematização de indicadores de desempenho operacionais de acompanhamento de projetos, percebida pelos gestores desta quando confrontados com tal conceito apontado por Terribili (2010), em uma organização de pesquisa e desenvolvimento (PD), tendo como objetivo apresentar uma proposta de painel de acompanhamento de projetos. Os processos de gerenciamento de projetos adotados pela organização foram caracterizados e, juntamente ao levantamento teórico, identificaram-se indicadores. A coleta de dados primários dividiu-se em entrevistas e questionários com gestores. As entrevistas apresentaram indicadores, resultando em um quadro de indicadores. Os questionários buscaram validar a importância dada pelos gestores aos indicadores, identificar o nível de abrangência e forma de apresentação, resultando na hierarquização dos indicadores. Por fim, as informações foram analisadas frente às diretrizes teóricas para criação de painéis de acompanhamento de projetos. Dentre indicadores da teoria, já utilizados pela organização e sugeridos pelos entrevistados, selecionou-se oito para compor o painel formado por dois modelos de tela: principal, com o resumo da situação de todos os projetos, e secundária, com o detalhamento dos indicadores por projeto. Como contribuições destacam-se a identificação da necessidade de um estudo mais profundo sobre indicadores de retrabalho e lições aprendidas para organização de PD.Universidade Nove de Julho (Uninove)Souza, Cibelle Alexandre deSchmitz, Leandro Costa2016-12-22info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.uninove.br/gep/article/view/965310.5585/gep.v7i3.321Revista de Gestão e Projetos; v. 7, n. 3 (2016): setembro-dezembro; 74-922236-0972reponame:Revista Gestão e Projetos (GeP)instname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEporhttps://periodicos.uninove.br/gep/article/view/9653/4398Direitos autorais 2016 Cibelle Alexandre de Souza, Leandro Costa Schmitzhttp://creativecommons.org/licenses/by-nc-nd/4.0info:eu-repo/semantics/openAccess2019-05-27T21:18:21Zoai:https://periodicos.uninove.br:article/9653Revistahttps://periodicos.uninove.br/gepPRIhttps://periodicos.uninove.br/gep/oaigep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br2236-09722236-0972opendoar:2019-05-27T21:18:21Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)false |
dc.title.none.fl_str_mv |
Project Performance Measurement Dashboard: A Proposal for Research and Development Organization Painel de Medição de Desempenho de Projetos: Uma Proposta para uma Organização de Pesquisa e Desenvolvimento |
title |
Project Performance Measurement Dashboard: A Proposal for Research and Development Organization |
spellingShingle |
Project Performance Measurement Dashboard: A Proposal for Research and Development Organization Souza, Cibelle Alexandre de Performance Indicators; Project Management; Dashboard; Research and Development. Indicadores de Desempenho; Gerenciamento de Projetos; Painel de Controle; Pesquisa e Desenvolvimento. |
title_short |
Project Performance Measurement Dashboard: A Proposal for Research and Development Organization |
title_full |
Project Performance Measurement Dashboard: A Proposal for Research and Development Organization |
title_fullStr |
Project Performance Measurement Dashboard: A Proposal for Research and Development Organization |
title_full_unstemmed |
Project Performance Measurement Dashboard: A Proposal for Research and Development Organization |
title_sort |
Project Performance Measurement Dashboard: A Proposal for Research and Development Organization |
author |
Souza, Cibelle Alexandre de |
author_facet |
Souza, Cibelle Alexandre de Schmitz, Leandro Costa |
author_role |
author |
author2 |
Schmitz, Leandro Costa |
author2_role |
author |
dc.contributor.none.fl_str_mv |
|
dc.contributor.author.fl_str_mv |
Souza, Cibelle Alexandre de Schmitz, Leandro Costa |
dc.subject.por.fl_str_mv |
Performance Indicators; Project Management; Dashboard; Research and Development. Indicadores de Desempenho; Gerenciamento de Projetos; Painel de Controle; Pesquisa e Desenvolvimento. |
topic |
Performance Indicators; Project Management; Dashboard; Research and Development. Indicadores de Desempenho; Gerenciamento de Projetos; Painel de Controle; Pesquisa e Desenvolvimento. |
description |
The research was motivated by the insufficient systematization of operational performance indicators of project monitoring, perceived by the managers of this when confronted with such concept of Terribili (2010), in a research and development (RD) organization, aiming to present a proposal for a project monitoring dashboard. The project management processes adopted by the organization were studied together with the theoretical survey to identify a set of indicators. The primary data collection was divided in interviews and questionnaires with managers. The interviews presented indicators resulting in a table of indicators. The questionnaires sought to validate the importance given by the managers to the indicators, to identify the level of coverage and form of presentation, resulting in the hierarchy of the indicators. Finally, the information was analyzed against the theory for the creation of project monitoring dashboards. Among the indicators of the theory, already used by the organization and suggested by the interviewees, eight were chosen to compose the dashboard shaped of two screen models: main, with a summary of the situation of all projects, and secondary, with the detailing of the indicators by project. As contributions the highlight is an identification of need for more in-depth study on rework indicators and lessons learned for RD organization. |
publishDate |
2016 |
dc.date.none.fl_str_mv |
2016-12-22 |
dc.type.none.fl_str_mv |
|
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9653 10.5585/gep.v7i3.321 |
url |
https://periodicos.uninove.br/gep/article/view/9653 |
identifier_str_mv |
10.5585/gep.v7i3.321 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9653/4398 |
dc.rights.driver.fl_str_mv |
Direitos autorais 2016 Cibelle Alexandre de Souza, Leandro Costa Schmitz http://creativecommons.org/licenses/by-nc-nd/4.0 info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Direitos autorais 2016 Cibelle Alexandre de Souza, Leandro Costa Schmitz http://creativecommons.org/licenses/by-nc-nd/4.0 |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
dc.source.none.fl_str_mv |
Revista de Gestão e Projetos; v. 7, n. 3 (2016): setembro-dezembro; 74-92 2236-0972 reponame:Revista Gestão e Projetos (GeP) instname:Universidade Nove de Julho (UNINOVE) instacron:UNINOVE |
instname_str |
Universidade Nove de Julho (UNINOVE) |
instacron_str |
UNINOVE |
institution |
UNINOVE |
reponame_str |
Revista Gestão e Projetos (GeP) |
collection |
Revista Gestão e Projetos (GeP) |
repository.name.fl_str_mv |
Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE) |
repository.mail.fl_str_mv |
gep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br |
_version_ |
1797052866231271424 |