Workload management allocation for research activities in a nonstate university: a case study

Detalhes bibliográficos
Autor(a) principal: Costa, Guilherme Holsbach
Data de Publicação: 2015
Outros Autores: Lopes, Cássio Guimarães
Tipo de documento: Artigo
Idioma: por
Título da fonte: RevistaBrasileiradePós-Graduação
Texto Completo: http://ojs.rbpg.capes.gov.br/index.php/rbpg/article/view/769
Resumo: The maintenance of scientific research has been a financial challenge for community (nonstate public) universities. The workload allocated to research activities is a problem involving several variables such as proportionality between instructors hired for full-time work and other work systems, the demand for administrative and teaching activities in the university and the scientific merit of each researcher, among others. In this paper a case study is presented, proposing a solution for the management of workload allocation for research. This solution is based on an optimization problem that considers the productivity of the involved researchers, characteristics of each area of knowledge, the metrics of the university under consideration for evaluating the scientific production and the hours allocated by the university exclusively for research activities.
id CAPES-1_8bf259a1c4197814de7ec2a53bd56071
oai_identifier_str oai:ojs.192.168.0.141:article/769
network_acronym_str CAPES-1
network_name_str RevistaBrasileiradePós-Graduação
spelling Workload management allocation for research activities in a nonstate university: a case studyGestão da concessão de carga horária para atividades de pesquisa em uma universidade não estatal: um estudo de casoGestión de la concesión de la carga de trabajo en actividades de investigación en una universidad no estatal: un estudio de casoInterdisciplinarProdução em pesquisa. Avaliação. Gestão Universitária.Scientific Production. Assessment. University Management.Producción Científica. Evaluación. Gestión Universitaria.The maintenance of scientific research has been a financial challenge for community (nonstate public) universities. The workload allocated to research activities is a problem involving several variables such as proportionality between instructors hired for full-time work and other work systems, the demand for administrative and teaching activities in the university and the scientific merit of each researcher, among others. In this paper a case study is presented, proposing a solution for the management of workload allocation for research. This solution is based on an optimization problem that considers the productivity of the involved researchers, characteristics of each area of knowledge, the metrics of the university under consideration for evaluating the scientific production and the hours allocated by the university exclusively for research activities.La preservación de la investigación científica ha sido un reto financiero para las Universidades Comunitarias (público no estatal). La asignación de la carga de trabajo destinada a la investigación es un problema que involucra diversas variables como la proporcionalidad entre los profesores contratados para trabajar tiempo completo y otros esquemas de trabajo, la demanda de las actividades administrativas y docentes en la institución y el mérito científico de cada investigador, entre otros. En este trabajo se presenta un estudio de caso y, sobre esta base, se propone una solución para la gestión de la concesión de la carga horaria de investigación. Esta solución se basa en un problema de optimización que tiene en cuenta la productividad de los investigadores partícipes, las características de cada área de conocimiento, las métricas para evaluar la producción científica de la institución y la capacidad de esta institución para conceder horas dedicadas a la investigación.A manutenção da pesquisa científica tem sido um desafio financeiro para as universidades comunitárias (públicas não estatais). A alocação de carga horária destinada à pesquisa é um problema que envolve diversas variáveis, como a proporcionalidade entre professores contratados em regime de trabalho de tempo integral e professores sob outros regimes, a demanda de atividades administrativas e de ensino na instituição e o mérito científico de cada pesquisador, entre outras. Neste trabalho é apresentado um estudo de caso e, com base nele, é proposta uma solução para a gerência da concessão de carga horária para pesquisa. Essa solução baseia-se em um problema de otimização que considera a produtividade dos pesquisadores envolvidos, particularidades de cada área do conhecimento, as métricas de avaliação da produção da instituição em análise e a capacidade dessa instituição de conceder carga horária para pesquisa.Revista Brasileira de Pós-GraduaçãoCosta, Guilherme HolsbachLopes, Cássio Guimarães2015-12-07info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttp://ojs.rbpg.capes.gov.br/index.php/rbpg/article/view/76910.21713/2358-2332.2015.v12.769RBPG; v. 12, n. 28 (2015)Revista Brasileira de Pós-Graduação; v. 12, n. 28 (2015)2358-23321806-8405reponame:RevistaBrasileiradePós-Graduaçãoinstname:CAPESinstacron:CAPESporhttp://ojs.rbpg.capes.gov.br/index.php/rbpg/article/view/769/pdfinfo:eu-repo/semantics/openAccess2019-07-20T15:50:36Zmail@mail.com -
dc.title.none.fl_str_mv Workload management allocation for research activities in a nonstate university: a case study
Gestão da concessão de carga horária para atividades de pesquisa em uma universidade não estatal: um estudo de caso
Gestión de la concesión de la carga de trabajo en actividades de investigación en una universidad no estatal: un estudio de caso
title Workload management allocation for research activities in a nonstate university: a case study
spellingShingle Workload management allocation for research activities in a nonstate university: a case study
Costa, Guilherme Holsbach
Interdisciplinar
Produção em pesquisa. Avaliação. Gestão Universitária.
Scientific Production. Assessment. University Management.
Producción Científica. Evaluación. Gestión Universitaria.
title_short Workload management allocation for research activities in a nonstate university: a case study
title_full Workload management allocation for research activities in a nonstate university: a case study
title_fullStr Workload management allocation for research activities in a nonstate university: a case study
title_full_unstemmed Workload management allocation for research activities in a nonstate university: a case study
title_sort Workload management allocation for research activities in a nonstate university: a case study
author Costa, Guilherme Holsbach
author_facet Costa, Guilherme Holsbach
Lopes, Cássio Guimarães
author_role author
author2 Lopes, Cássio Guimarães
author2_role author
dc.contributor.none.fl_str_mv


dc.contributor.author.fl_str_mv Costa, Guilherme Holsbach
Lopes, Cássio Guimarães
dc.subject.none.fl_str_mv

dc.subject.por.fl_str_mv Interdisciplinar
Produção em pesquisa. Avaliação. Gestão Universitária.
Scientific Production. Assessment. University Management.
Producción Científica. Evaluación. Gestión Universitaria.
topic Interdisciplinar
Produção em pesquisa. Avaliação. Gestão Universitária.
Scientific Production. Assessment. University Management.
Producción Científica. Evaluación. Gestión Universitaria.
dc.description.none.fl_txt_mv The maintenance of scientific research has been a financial challenge for community (nonstate public) universities. The workload allocated to research activities is a problem involving several variables such as proportionality between instructors hired for full-time work and other work systems, the demand for administrative and teaching activities in the university and the scientific merit of each researcher, among others. In this paper a case study is presented, proposing a solution for the management of workload allocation for research. This solution is based on an optimization problem that considers the productivity of the involved researchers, characteristics of each area of knowledge, the metrics of the university under consideration for evaluating the scientific production and the hours allocated by the university exclusively for research activities.
La preservación de la investigación científica ha sido un reto financiero para las Universidades Comunitarias (público no estatal). La asignación de la carga de trabajo destinada a la investigación es un problema que involucra diversas variables como la proporcionalidad entre los profesores contratados para trabajar tiempo completo y otros esquemas de trabajo, la demanda de las actividades administrativas y docentes en la institución y el mérito científico de cada investigador, entre otros. En este trabajo se presenta un estudio de caso y, sobre esta base, se propone una solución para la gestión de la concesión de la carga horaria de investigación. Esta solución se basa en un problema de optimización que tiene en cuenta la productividad de los investigadores partícipes, las características de cada área de conocimiento, las métricas para evaluar la producción científica de la institución y la capacidad de esta institución para conceder horas dedicadas a la investigación.
A manutenção da pesquisa científica tem sido um desafio financeiro para as universidades comunitárias (públicas não estatais). A alocação de carga horária destinada à pesquisa é um problema que envolve diversas variáveis, como a proporcionalidade entre professores contratados em regime de trabalho de tempo integral e professores sob outros regimes, a demanda de atividades administrativas e de ensino na instituição e o mérito científico de cada pesquisador, entre outras. Neste trabalho é apresentado um estudo de caso e, com base nele, é proposta uma solução para a gerência da concessão de carga horária para pesquisa. Essa solução baseia-se em um problema de otimização que considera a produtividade dos pesquisadores envolvidos, particularidades de cada área do conhecimento, as métricas de avaliação da produção da instituição em análise e a capacidade dessa instituição de conceder carga horária para pesquisa.
description The maintenance of scientific research has been a financial challenge for community (nonstate public) universities. The workload allocated to research activities is a problem involving several variables such as proportionality between instructors hired for full-time work and other work systems, the demand for administrative and teaching activities in the university and the scientific merit of each researcher, among others. In this paper a case study is presented, proposing a solution for the management of workload allocation for research. This solution is based on an optimization problem that considers the productivity of the involved researchers, characteristics of each area of knowledge, the metrics of the university under consideration for evaluating the scientific production and the hours allocated by the university exclusively for research activities.
publishDate 2015
dc.date.none.fl_str_mv 2015-12-07
dc.type.none.fl_str_mv


dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://ojs.rbpg.capes.gov.br/index.php/rbpg/article/view/769
10.21713/2358-2332.2015.v12.769
url http://ojs.rbpg.capes.gov.br/index.php/rbpg/article/view/769
identifier_str_mv 10.21713/2358-2332.2015.v12.769
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv http://ojs.rbpg.capes.gov.br/index.php/rbpg/article/view/769/pdf
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Revista Brasileira de Pós-Graduação
publisher.none.fl_str_mv Revista Brasileira de Pós-Graduação
dc.source.none.fl_str_mv RBPG; v. 12, n. 28 (2015)
Revista Brasileira de Pós-Graduação; v. 12, n. 28 (2015)
2358-2332
1806-8405
reponame:RevistaBrasileiradePós-Graduação
instname:CAPES
instacron:CAPES
reponame_str RevistaBrasileiradePós-Graduação
collection RevistaBrasileiradePós-Graduação
instname_str CAPES
instacron_str CAPES
institution CAPES
repository.name.fl_str_mv -
repository.mail.fl_str_mv mail@mail.com
_version_ 1639987074339700736