A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos

Detalhes bibliográficos
Autor(a) principal: Napolitano, Domingos M??rcio Rodrigues
Data de Publicação: 2014
Tipo de documento: Dissertação
Idioma: por
Título da fonte: Biblioteca Digital de Teses e Dissertações da Uninove
Texto Completo: http://bibliotecatede.uninove.br/handle/tede/1377
Resumo: The decisions are central space within organizations and become more complex under conditions of uncertainty. This implies that to meet the demand for the success and quality of decisions should establish a decision-making process that will have as core elements of these decisions the scenarios, the alternatives and their impacts . On the other hand the theory and practice of project management seeks to manage risks through tools and techiniques that enable project managers perform choices on the actions that enable to achieve project objectives. In this sense, there are many studies that suggest the influence of risk management practices in successful projects. Risk management consists of planning, identification, analysis, planning responses and monitoring and control. The importance of the identication process is dependent on the subsequent phases of all their results and the decisions made about them. So when identifying risks decisions that enable their treatment aiming the project's success will be needed. In this context, the present work studied the influence of risk identification in the decisions about the risks in projects. The study was based on a literature review of risk management in projects and the characteristics of decision-making in risky situations , which made it possible to operationalize a construct and respctivas study hypotheses . Thus, it was defined a research tool outlined by a survey type lift, for which valid responses were obtained 35. Results were analyzed using statistical techniques, confirmed that two of the three hypotheses. The main findings were that, at least for the sample studied, the practices of the risk identification process project risk influence decisions on projects, which may be based on basic elements of decision theory. In this sense it was also found that these same practices positively influence the effectiveness of decisions at least in the way they are perceived by the respondents of the questionnaire. The data analysis it was observed that there is a tendency to frequent use of elements of project planning and timelines and cost estimates, but the same was not observed in the use of specific tools and techniques of risk management. With respect to decisions we observed that there is a tendency to consider the cost impacts more frequently than the impacts in time, scope or quality. Are recommended further work on the issue of the relationship between risk management practices and decisions of project managers in the bibliography since there have been few studies on the subject.
id NOVE_0e3feb62dfe4fcfba8a09a93260b5cd8
oai_identifier_str oai:localhost:tede/1377
network_acronym_str NOVE
network_name_str Biblioteca Digital de Teses e Dissertações da Uninove
repository_id_str
spelling Rabechini Junior, Roquehttp://lattes.cnpq.br/1996533325699482Rabechini Junior, Roquehttp://lattes.cnpq.br/1996533325699482Freitas, Franciane Silveirahttp://lattes.cnpq.br/2841051412997153Jugend, Danielhttp://lattes.cnpq.br/2068042414626399http://lattes.cnpq.br/0433818215929535Napolitano, Domingos M??rcio Rodrigues2016-06-02T15:13:03Z2014-03-20Napolitano, Domingos M??rcio Rodrigues. A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos. 2014. 94 f. Disserta????o( Programa de Mestrado Profissional em Administra????o - Gest??o de Projetos) - Universidade Nove de Julho, S??o Paulo.http://bibliotecatede.uninove.br/handle/tede/1377The decisions are central space within organizations and become more complex under conditions of uncertainty. This implies that to meet the demand for the success and quality of decisions should establish a decision-making process that will have as core elements of these decisions the scenarios, the alternatives and their impacts . On the other hand the theory and practice of project management seeks to manage risks through tools and techiniques that enable project managers perform choices on the actions that enable to achieve project objectives. In this sense, there are many studies that suggest the influence of risk management practices in successful projects. Risk management consists of planning, identification, analysis, planning responses and monitoring and control. The importance of the identication process is dependent on the subsequent phases of all their results and the decisions made about them. So when identifying risks decisions that enable their treatment aiming the project's success will be needed. In this context, the present work studied the influence of risk identification in the decisions about the risks in projects. The study was based on a literature review of risk management in projects and the characteristics of decision-making in risky situations , which made it possible to operationalize a construct and respctivas study hypotheses . Thus, it was defined a research tool outlined by a survey type lift, for which valid responses were obtained 35. Results were analyzed using statistical techniques, confirmed that two of the three hypotheses. The main findings were that, at least for the sample studied, the practices of the risk identification process project risk influence decisions on projects, which may be based on basic elements of decision theory. In this sense it was also found that these same practices positively influence the effectiveness of decisions at least in the way they are perceived by the respondents of the questionnaire. The data analysis it was observed that there is a tendency to frequent use of elements of project planning and timelines and cost estimates, but the same was not observed in the use of specific tools and techniques of risk management. With respect to decisions we observed that there is a tendency to consider the cost impacts more frequently than the impacts in time, scope or quality. Are recommended further work on the issue of the relationship between risk management practices and decisions of project managers in the bibliography since there have been few studies on the subject.As decis??es ocupam um espa??o central nas organiza????es e tornam-se mais complexas em condi????es de incerteza. Isto que implica que para atender a demanda pelo sucesso e qualidade das decis??es deve-se estabelecer um processo decis??rio que ter?? como elementos centrais os cen??rios destas decis??es, as alternativas e seus impactos. Por outro lado a teoria e pr??tica de gerenciamento de projetos busca gerenciar riscos por meio de ferramentas que permitam aos gerentes de projetos realizarem escolhas sobre as a????es que possibilitem atingir os objetivos dos projetos. Neste sentido, existem diversos estudos, que evidenciam a influ??ncia das pr??ticas de gest??o de riscos no sucesso dos projetos. A gest??o de riscos ?? composta por processos de planejamento, identifica????o, an??lise, planejamento das respostas e monitoramento e controle. A import??ncia do processo de identica????o reside na depend??ncia das fases subsequentes de todos os seus resultados, bem como das decis??es tomadas sobre os mesmos. Assim ao identificar os riscos ser??o necess??rias decis??es que viabilizem seu tratamento objetivando o sucesso do projeto. Neste contexto o presente trabalho estudou a influ??ncia do processo de identifica????ode riscos nas decis??es sobre os riscos em projetos. O estudo foi baseado numa revis??o bibliogr??fica sobre a gest??o de riscos em projetos e sobre as caracter??sticas da tomada de decis??o em situa????es de risco, que possibilitou operacionalizar um constructo e as respctivas hip??teses do estudo. Deste modo, foi definido um instrumento de pesquisa, delineado por meio de um levantamento tipo survey, para o qual se obtiveram 35 respostas v??lidas. Os resultados forma analisados por meio de t??cnicas estat??sticas, que confirmaram duas das tr??s hip??teses formuladas. As principais conclus??es foram que, ao menos para a amostra pesquisada, as pr??ticas do processo de identifica????o de riscos em projetos influ??nciam nas decis??es de riscos em projetos, que podem ser baseadas em elementos b??sicos da teoria da decis??o. Neste sentido tamb??m se verificou que essas mesmas pr??ticas influ??nciam de modo positivo a efic??cia das decis??es ao menos na forma como s??o percebidas pelos respondentes do question??rio. Da an??lise dos dados obtidos observou-se que h?? uma tend??ncia de uso frequente de elementos do planejamento do projeto como cronogramas e estimativas de custo, mas o mesmo n??o foi observado no uso de ferramentas e t??cnicas espec??ficas da gest??o de riscos. Com rela????o ??s decis??es tomadas observou-se que h?? uma tend??ncia de considerar os impactos nos custos com maior frequ??ncia do que em prazo, escopo ou qualidade. Recomendam-se futuros trabalhos sobre o tema das rela????es entre as pr??ticas de gest??o de riscos e as decis??es dos gerentes de projetos j?? que na bibliogr??fia consultada verificaram-se poucos estudos sobre o assunto.Submitted by Nadir Basilio (nadirsb@uninove.br) on 2016-06-02T15:13:03Z No. of bitstreams: 1 Domingos Marcio Rodrigues Napolitano.pdf: 3017064 bytes, checksum: 4fde25d7639251b1afe36bffbc2db6c6 (MD5)Made available in DSpace on 2016-06-02T15:13:03Z (GMT). No. of bitstreams: 1 Domingos Marcio Rodrigues Napolitano.pdf: 3017064 bytes, checksum: 4fde25d7639251b1afe36bffbc2db6c6 (MD5) Previous issue date: 2014-03-20application/pdfporUniversidade Nove de JulhoPrograma de P??s-Gradua????o em Gest??o de ProjetosUNINOVEBrasilAdministra????oprocessos decis??riosgest??o de projetosgest??o de riscos em projetosdecision-makingproject managementproject risk managementCIENCIAS SOCIAIS APLICADAS::ADMINISTRACAOA tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscosDecision-making in projects: an exploratory study on the risk identification processinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis8024035432632778221600info:eu-repo/semantics/openAccessreponame:Biblioteca Digital de Teses e Dissertações da Uninoveinstname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEORIGINALDomingos Marcio Rodrigues Napolitano.pdfDomingos Marcio Rodrigues Napolitano.pdfapplication/pdf3017064http://localhost:8080/tede/bitstream/tede/1377/2/Domingos+Marcio+Rodrigues+Napolitano.pdf4fde25d7639251b1afe36bffbc2db6c6MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-82165http://localhost:8080/tede/bitstream/tede/1377/1/license.txtbd3efa91386c1718a7f26a329fdcb468MD51tede/13772019-06-19 16:28:51.944oai:localhost: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Biblioteca Digital de Teses e Dissertaçõeshttp://bibliotecatede.uninove.br/PRIhttp://bibliotecatede.uninove.br/oai/requestbibliotecatede@uninove.br||bibliotecatede@uninove.bropendoar:2019-06-19T19:28:51Biblioteca Digital de Teses e Dissertações da Uninove - Universidade Nove de Julho (UNINOVE)false
dc.title.por.fl_str_mv A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos
dc.title.alternative.eng.fl_str_mv Decision-making in projects: an exploratory study on the risk identification process
title A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos
spellingShingle A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos
Napolitano, Domingos M??rcio Rodrigues
processos decis??rios
gest??o de projetos
gest??o de riscos em projetos
decision-making
project management
project risk management
CIENCIAS SOCIAIS APLICADAS::ADMINISTRACAO
title_short A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos
title_full A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos
title_fullStr A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos
title_full_unstemmed A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos
title_sort A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos
author Napolitano, Domingos M??rcio Rodrigues
author_facet Napolitano, Domingos M??rcio Rodrigues
author_role author
dc.contributor.advisor1.fl_str_mv Rabechini Junior, Roque
dc.contributor.advisor1Lattes.fl_str_mv http://lattes.cnpq.br/1996533325699482
dc.contributor.referee1.fl_str_mv Rabechini Junior, Roque
dc.contributor.referee1Lattes.fl_str_mv http://lattes.cnpq.br/1996533325699482
dc.contributor.referee2.fl_str_mv Freitas, Franciane Silveira
dc.contributor.referee2Lattes.fl_str_mv http://lattes.cnpq.br/2841051412997153
dc.contributor.referee3.fl_str_mv Jugend, Daniel
dc.contributor.referee3Lattes.fl_str_mv http://lattes.cnpq.br/2068042414626399
dc.contributor.authorLattes.fl_str_mv http://lattes.cnpq.br/0433818215929535
dc.contributor.author.fl_str_mv Napolitano, Domingos M??rcio Rodrigues
contributor_str_mv Rabechini Junior, Roque
Rabechini Junior, Roque
Freitas, Franciane Silveira
Jugend, Daniel
dc.subject.por.fl_str_mv processos decis??rios
gest??o de projetos
gest??o de riscos em projetos
topic processos decis??rios
gest??o de projetos
gest??o de riscos em projetos
decision-making
project management
project risk management
CIENCIAS SOCIAIS APLICADAS::ADMINISTRACAO
dc.subject.eng.fl_str_mv decision-making
project management
project risk management
dc.subject.cnpq.fl_str_mv CIENCIAS SOCIAIS APLICADAS::ADMINISTRACAO
description The decisions are central space within organizations and become more complex under conditions of uncertainty. This implies that to meet the demand for the success and quality of decisions should establish a decision-making process that will have as core elements of these decisions the scenarios, the alternatives and their impacts . On the other hand the theory and practice of project management seeks to manage risks through tools and techiniques that enable project managers perform choices on the actions that enable to achieve project objectives. In this sense, there are many studies that suggest the influence of risk management practices in successful projects. Risk management consists of planning, identification, analysis, planning responses and monitoring and control. The importance of the identication process is dependent on the subsequent phases of all their results and the decisions made about them. So when identifying risks decisions that enable their treatment aiming the project's success will be needed. In this context, the present work studied the influence of risk identification in the decisions about the risks in projects. The study was based on a literature review of risk management in projects and the characteristics of decision-making in risky situations , which made it possible to operationalize a construct and respctivas study hypotheses . Thus, it was defined a research tool outlined by a survey type lift, for which valid responses were obtained 35. Results were analyzed using statistical techniques, confirmed that two of the three hypotheses. The main findings were that, at least for the sample studied, the practices of the risk identification process project risk influence decisions on projects, which may be based on basic elements of decision theory. In this sense it was also found that these same practices positively influence the effectiveness of decisions at least in the way they are perceived by the respondents of the questionnaire. The data analysis it was observed that there is a tendency to frequent use of elements of project planning and timelines and cost estimates, but the same was not observed in the use of specific tools and techniques of risk management. With respect to decisions we observed that there is a tendency to consider the cost impacts more frequently than the impacts in time, scope or quality. Are recommended further work on the issue of the relationship between risk management practices and decisions of project managers in the bibliography since there have been few studies on the subject.
publishDate 2014
dc.date.issued.fl_str_mv 2014-03-20
dc.date.accessioned.fl_str_mv 2016-06-02T15:13:03Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv Napolitano, Domingos M??rcio Rodrigues. A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos. 2014. 94 f. Disserta????o( Programa de Mestrado Profissional em Administra????o - Gest??o de Projetos) - Universidade Nove de Julho, S??o Paulo.
dc.identifier.uri.fl_str_mv http://bibliotecatede.uninove.br/handle/tede/1377
identifier_str_mv Napolitano, Domingos M??rcio Rodrigues. A tomada de decis??o em projetos: um estudo explorat??rio sobre o processo de identifica????o de riscos. 2014. 94 f. Disserta????o( Programa de Mestrado Profissional em Administra????o - Gest??o de Projetos) - Universidade Nove de Julho, S??o Paulo.
url http://bibliotecatede.uninove.br/handle/tede/1377
dc.language.iso.fl_str_mv por
language por
dc.relation.cnpq.fl_str_mv 8024035432632778221
dc.relation.confidence.fl_str_mv 600
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Nove de Julho
dc.publisher.program.fl_str_mv Programa de P??s-Gradua????o em Gest??o de Projetos
dc.publisher.initials.fl_str_mv UNINOVE
dc.publisher.country.fl_str_mv Brasil
dc.publisher.department.fl_str_mv Administra????o
publisher.none.fl_str_mv Universidade Nove de Julho
dc.source.none.fl_str_mv reponame:Biblioteca Digital de Teses e Dissertações da Uninove
instname:Universidade Nove de Julho (UNINOVE)
instacron:UNINOVE
instname_str Universidade Nove de Julho (UNINOVE)
instacron_str UNINOVE
institution UNINOVE
reponame_str Biblioteca Digital de Teses e Dissertações da Uninove
collection Biblioteca Digital de Teses e Dissertações da Uninove
bitstream.url.fl_str_mv http://localhost:8080/tede/bitstream/tede/1377/2/Domingos+Marcio+Rodrigues+Napolitano.pdf
http://localhost:8080/tede/bitstream/tede/1377/1/license.txt
bitstream.checksum.fl_str_mv 4fde25d7639251b1afe36bffbc2db6c6
bd3efa91386c1718a7f26a329fdcb468
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
repository.name.fl_str_mv Biblioteca Digital de Teses e Dissertações da Uninove - Universidade Nove de Julho (UNINOVE)
repository.mail.fl_str_mv bibliotecatede@uninove.br||bibliotecatede@uninove.br
_version_ 1811016869391368192